Industry Wake | Spot On Wake
906
page-template,page-template-full_width,page-template-full_width-php,page,page-id-906,qode-listing-1.0.1,qode-social-login-1.0,qode-news-1.0,qode-quick-links-1.0,qode-restaurant-1.0,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,qode-child-theme-ver-1.0.0,qode-theme-ver-12.0.1,qode-theme-bridge,bridge-child,wpb-js-composer js-comp-ver-5.4.2,vc_responsive
Spot On Wake is a rural development and a great example of farm diversification. The idea to build a cable wakeboard park on the family farm had been brewing in owner Pete’s mind for a number of years. With a background in landscaping and farming Pete decided he wanted to dig the lake himself, and literally did just that over the winter of 2015/2016. He put serious blood, sweat and tears into digging the lakes and his park opened in spring 2017.

Pete contacted us fairly early in his development stages and he had grand ideas for building a multi-level lake. We consulted to help with the layout and shape of the lakes and then provided the cable systems and floating obstacles. Once the lakes were finished we also consulted and helped with parts of the construction for the features on the multi-level pools. The end result is an epic wake park in a beautiful rural setting.

 

www.spotonwake.co.uk

We supplied:

Development consultancy to help shape and size the lakes

2x Sesitec System 2.0’s

6x Industry Wake Parks obstacles

Installation of Wake Park

Staff Training

Consultancy on pool gap features

Get In Touch